HxGN MinePlan Underground Engineering

Building a mine design manually takes time. Engineers must quickly model all preceding activities that lead to production. 3D visualization, room and pillar, and Engineering UG CAD tools help to avoid these issues. Engineers can quickly evaluate and optimize stope designs and create mine designs and activity-based schedules.

HxGN MinePlan Underground Engineering

HxGN MinePlan UG Strategic Planning

Evaluate strategic mining scenarios using MinePlan to generate economic stope limits based on economics and constraints.

HxGN MinePlan Underground Engineering Suite's packages can help you to improve efficiency at your mine, avoiding the risk of increased dilution or settling for sub-optimal scenarios.

It's time-consuming to build a mine design manually, and engineers need to be able to quickly model all preceding activities that lead to production. With no insight into equipment resources, mines risk under-utilizing equipment.

3D visualization, room and pillar, and Engineering UG CAD tools help to avoid these issues and save engineers time, enabling them to evaluate and optimize stope designs and create mine designs and activity-based schedules.

Click here to interactively explore your own life-of-mine journey.